
Worn by 2 dogs on the wall below.
Leads · Leinen
Long Lead 300 cm × 15 mm
Three metres of narrow line for open ground.
€72,00 EURincl. 19% VAT · plus shipping
01Fit and width
- Fits
- One size
- Strap width
- 15 mm
- Length
- 300 cm
Sizes here follow a measured circumference in centimetres, never a breed name. How to measure · Size & pull check
02Hardware and load
- Material
- Solid brass, cast and hand-polished
- Static pull test value
- Not published yet
- Test method
- Not published yet
The test certificate for this hardware batch is being prepared with the supplier. Until it exists we publish no number.
Any pull figure we publish is measured under static test conditions. It is not a dynamic impact limit, and it is not a guarantee for any individual item.
03Before every walk
Leather and hardware age with use. Check the buckle, D-ring and stitching before every walk. Stop using and replace the item as soon as you see cracking, deformation or loose stitching.
Not intended for tethering a dog that is left unattended.
Not a vehicle restraint. Securing a dog in a car requires a tested car safety-belt system; nothing sold here is designed or tested for that purpose.
05Leather and materials
- Designation
- VollnarbenlederFull-grain cowhide
- Tannage
- Vegetable-tanned
- Thickness
- 3.0–3.4 mm
- Layer
- Top grain (Vollnarben / narbenseitig)
Hides are legal by-products of food livestock. We do not sell CITES-listed species leather or real fur. Chromium VI is limited to ≤ 3 mg/kg and azo dyes to the REACH Annex XVII limits; metal fittings meet the REACH nickel release limit. Supplier declarations for the current batch are on file and can be requested by email.
Dyes and tanning agents are used in every leather article. Do not let a dog chew leather goods for extended periods.
06Care and natural variation
Coil rather than fold. A folded crease in a long line becomes a weak point.
Grain, scars and shade vary from hide to hide, and the colour of a vegetable-tanned piece deepens with light and use. Two pieces ordered at different times will not match exactly. That is the material behaving normally, not a defect.
07Price, shipping and returns
€72,00 EUR including 19% German VAT. Shipping rates and delivery times. Free shipping within Germany from €90.
Consumers have a 14-day right of withdrawal. Unworn items can also be returned under our returns and refunds policy; refunds are issued to the original payment method within 14 days of us receiving the item back.
A 300 cm line cut narrow at 15 mm so the weight stays reasonable over that length. For fields, forest tracks and any place where the dog can range without a road nearby.
A long line needs handling: keep it off the ground where it can loop around legs, and wear gloves if the dog is heavy. The Leash Glove Pair exists for exactly this.
Brass swivel snap at the dog end, folded hand loop at yours, and one intermediate ring at 150 cm so the line can be halved.
On the wall
Owner-submitted photographs where this piece is being worn. Published with consent.

Pip
sent in by Damian

Lotte
sent in by Felix
Rest of the leads line

City Lead 120 cm × 18 mm
- 18 mm
- 120 cm
A short 120 cm lead for pavements and close work.
€54,00 EURincl. VAT

Standard Lead 180 cm × 20 mm
- 20 mm
- 180 cm
The everyday length: 180 cm, 20 mm wide.
€62,00 EURincl. VAT

Adjustable Multi-Length Lead 200 cm
- 18 mm
- 200 cm
Three working lengths from one lead: 100, 150 and 200 cm.
€79,00 EURincl. VAT

Rolled Round Lead 150 cm
- 14 mm
- 150 cm
A round section that sits more kindly in the hand than a flat strap.
€66,00 EURincl. VAT

Hands-Free Waist Lead 150 cm
- 18 mm
- 150 cm
A 150 cm lead that clips to a belt so both hands stay free.
€74,00 EURincl. VAT

Traffic Handle Lead 100 cm
- 20 mm
- 100 cm
A 100 cm lead with a second handle close to the snap.
€58,00 EURincl. VAT